The three cadences
A Cadence is an interval, not a calendar rule. It counts forward from the time a prompt last ran. 3x a week therefore repeats at the same three times each week, and you do not choose the days.
Change a project’s Cadence
1
Open the prompts screen
Open Settings and select the Prompts tab.
2
Find the project banner
Each project has a banner with its name, its engines and its credits.
3
Choose a Cadence
Select Daily, 3x a week or Weekly in the banner. The credit figures update as you choose.
4
Save your changes
Save the plan. The new Cadence applies from the next scheduled measurement.
Mentioned enables the Cadence choice one project at a time. A project without the choice runs Daily.
Cadence does not change your metrics
Every prompt has equal influence on your metrics, whatever its Cadence. Mentioned scores a rolling sample of recent answers rather than one scan. A Weekly prompt therefore stays in that sample between its runs. Cadence changes two things: how fresh your data is, and how many credits your plan uses. It does not change which prompts count towards a metric. A slower Cadence collects fewer answers over the same period. Your metrics then rest on a smaller sample, so single answers move them more.What uses credits
One credit is one prompt measured on one engine. A prompt that runs Daily on all four engines uses 124 credits in a full billing period. The Prompts screen shows the credit cost of each prompt, each topic and each project over a full billing period. Two things set that cost:- The Cadence. A Daily prompt runs more often than a Weekly prompt, so it uses more credits.
- The engines. Each engine that a prompt runs on adds to the cost of that prompt.
Your credit allowance
Your plan gives your account a credit allowance for each billing period. One allowance covers all of your projects and all of the people in your Team. A project does not have its own prompt limit.
The Planned monthly usage meter at the top of the Prompts screen shows the credits that your saved prompts use. It also shows how many more Daily prompts your allowance has room for.
When a change goes over your allowance
Mentioned does not save a change that takes your planned usage over your allowance. The Prompts screen shows the credits that the change needs and the credits that your plan includes. No part of that change is saved. To make room, do one or more of these:- Pause a prompt.
- Remove a prompt.
- Choose a slower Cadence, if your project has the Cadence choice.
- Change to a larger plan.
Pause a prompt
When you pause a prompt, Mentioned stops measuring it. A paused prompt uses no credits, and its past results stay in your account. Your metrics then come from fewer prompts. Resume the prompt to measure it again.Tracked prompts
Open Settings and select the Prompts tab. You can add, change, pause and remove prompts there. Select Save changes to apply them. A change applies from the next scheduled measurement.A change to your Cadence changes how often Mentioned measures, not what Mentioned measures. To compare two periods fairly, check that both use the same prompts, engines and competitors.

